Concrete Repairs

Factory Floor repairs  - Heavy duty

Pikes point Refuse Transfer Station

Repairing a 1500 sqm section of suspended concrete floor with damage and wear down to the 16mm reinforcing bars which were integral to the floor design of the whole structure.

Surface prep and topping mix design, applied with follow up wear factors, checked every 2 years.